![]() ![]() New surplus vessel Principal Vessel Connections: Panax 16 X 5 740psi 2-Phase Vertical Separator MAWP 740psi 100degF, MDMT -20degF 740psi Corrosion ance 18, RT-2, Sweet service ABSA Approved design registered in Ab, BC Sask Built and certified to ASME U stamp standard 2 300 Inlet cw 2 elbow diverter 2 300 Gas outlet 2 300 Drain Liquid outlet connection LC connection PSV connection HLSD connection 2 - 2 npt Inspection connection 2 - LG connections TI connection PI connection Delivery Stock. Relief valves piped outside Piping to skid edge cw individual connections Piping and instrument tubing securely supported Package is readied or dismantled only to the extent required for shipping Quality ControlTesting: Hydro tested to 1.5 times working pressure ABSA registered QC program 10 X-ray, No PWHT All instrumentation pneumatic tested and function tested Painting: Painted using one coat grey phenolic primer, one coat industrial enamel in light grey Complete drawing set available Show Less. Relief valves piped outside Piping to skid edge cw individual connections Piping and instrument tubing securely supported Package is readied or dismantled only to the extent required for shipping Quality ControlTesting: Hydro tested to 1.5 times working pressure ABSA registered QC program 10 X-ray, No PWHT All instrumentation pneumatic tested and function tested Painting: Painted using one coat grey phenolic primer, one coat industrial enamel in light grey Complete drawing set available. New Surplus 16 x 5Vertical 720 psig, sweet service separator, ready to go to work Never used, but to be delivered fully function tested and with up to date, reset PSVs. Relief valves piped outside Piping to skid edge cw individual connections Piping and instrument tubing securely supported Package is readied or dismantled only to the extent required for shipping Quality ControlTesting: Hydro tested to 1.5 times working pressure ABSA registered QC program 10 X-ray, No PWHT All instrumentation pneumatic tested and function tested Painting: SSPC-SP3 Surface preparation Painted with Cloverdale grey phenolic primer and Cloverdale industrial enamel in light grey. Relief valves piped outside Piping to skid edge cw individual connections Piping and instrument tubing securely supported Package is readied or dismantled only to the extent required for shipping Quality ControlTesting: Hydro tested to 1.5 times working pressure ABSA registered QC program 10 X-ray, No PWHT All instrumentation pneumatic tested and function tested Painting: SSPC-SP3 Surface preparation Painted with Cloverdale grey phenolic primer and Cloverdale industrial enamel in light grey Show Less. ![]() Turbine internals are not sized for any specific process flowing conditions. ![]() Price subject to change based on sizing results. PSV is based on a standard e orifice and is not sized for any specific process flowing conditions.Ĭontrol valve comes with standard port (trim) size (or largest available). El mexicano enano libro pdf trial#Norriseal 1001A Trial Enamel InRelief valves piped outside Piping to skid edge cw individual connections Piping and instrument tubing securely supported Package is readied or dismantled only to the extent required for shipping Quality ControlTesting: Hydro tested to 1.5 times working pressure ABSA registered QC program 10 X-ray, No PWHT All instrumentation pneumatic tested and function tested Painting: SSPC-SP3 Surface preparation Painted with Cloverdale grey phenolic primer and Cloverdale industrial enamel in light grey Standard Drafting Terms: a) General arrangement drawings, with one revision after customer markups, are included in the quoted price.If further changes or revisions are required after the first revision has been issued, extra charges for engineering and drafting are applicable.Notes: 1. El mexicano enano libro pdf full#New, surplus 16 x 7-6, 600 ANSI, sweet service vertical separator package New surplus, never used, built in Drawing package with full description available Summary: Sweet Service 3 phase Gas leg 2 Dynaflo meter run, simplex Barton 3 pen recorder Liquid legs Dynaflo 2 NPT LC Dynaflo 1 NPT LCV Primary Flow 1 NPT turbine meters Fuel Gas Fuel Gas scrubber 8 x 30 Auto Drain HLSD PSVs on FGS, Taylor 1 x 1 on separator, Taylor 1 x 1 Two more, Umpro 14 NPT, 1440 Also included Inlet Control MasterFlo 2 inline choke valve LSH: Murphy 2 PSH: CVS Type 7970 COE Chemical injection pump Catadyne heater, 24,000 BTUhr TI PI x 3 PRV Belgas 1 NPT PRV Belgas 14 LG, RJV YStrainer 1 Tank, Westeel, 300 USGal. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |